Jennifer, Jeremy, and Savanna went out on site to check the progress of construction of this studio project. This project is currently in Phase 5 and includes 8 stages, totaling in 190,000 SF, 100,000 SF of office space, and 100,000 SF of workshop space; it is a grand total of 390,000 SF. The stages are constructed using pre-engineered steel roof trusses on concrete tilt-up wall panels. The offices are steel framing with chevron bracing and pre-engineered roof joists. The warehouses are pre-engineered metal buildings with textured wall panels and a standing seam metal roof. These massive stages make you feel small in comparison, especially when standing in a 20x20 elephant door opening!